highway

Snow blankets Lake Tahoe and Sierra, chance of sunshine moving in for a few days

SOUTH LAKE TAHOE, Calif. - A quick-moving storm made its was over the Sierra and Lake Tahoe Saturday night and Sunday morning, leaving behind a few inches of snow and the beautiful views the region is known for.

Recorded snowfall in South Lake Tahoe was 5" with 7" at Heavenly Mountain Resort and 7-10" over at Homewood. The forecast shows some days with sunshine and cold nights ahead until the next chance of snow on Wednesday and again next weekend.

Ceremony to celebrate completion of new SR 89 realignment and bridge project in Tahoe City

Event Date: 
December 16, 2019 - 10:00am

TAHOE CITY, Calif. – A ribbon-cutting ceremony will be held on Monday, December 16 to celebrate the opening of the State Route 89 realignment, including the new Truckee River Bridge in Tahoe City.

Attendee parking will be located at the Tahoe City Transit Center along West Lake Blvd. The public should plan to arrive by 9:45 a.m. to park and walk to the ceremony location, which starts at 10:00 a.m. The bridge will be closed for the event.

Discarded plastic sleds around Lake Tahoe a focus of artwork and Tahoe Fund project

LAKE TAHOE, Calif./Nev. = Discarded plastic sleds and their pieces +are still an issue around Lake Tahoe and continue to be a focus of efforts with partners of the Tahoe Fund. One local artist has taken this unsightly trash and used the discarded sled pieces found on sled hills around Lake Tahoe to create an eight-foot-diameter "Sledflakes."

LTVA a drop-off spot for toys, food and cash donations for Christmas Cheer

The Lake Tahoe Visitors Authority will be a drop-off point this month for the annual Christmas Cheer toy, food, and cash drive.

Until December 17 they will be receiving items at their Stateline, Nevada Visitor Center location across the highway from Lakeside Inn at 169 US50. They are open from 9:00 a.m. to 5:00 p.m. Monday-Friday and 9:00 a.m. to 4:00 p.m. on Saturday and Sunday.

Lake Tahoe and Sierra roadwork December 8-14

SOUTH LAKE TAHOE, Calif. - Snow and winter may have arrived, but there is still some work scheduled, weather permitting.

SPECIAL EVENT

U.S. Highway 50 (El Dorado County): Motorists can expect the eastbound and westbound turn lanes from U.S. Highway 50 at Bedford Avenue and the eastbound off-ramps at Broadway and Schnell School Road to be closed from noon to 3 p.m. Sunday for the annual Placerville Christmas Parade.

LONG-TERM PROJECTS

24th annual Parade of Lights in Douglas County Saturday

DOUGLAS COUNTY, Nev. - The 24th annual Parade of Lights presented by the Carson Valley Chamber of Commerce will be held on Saturday, December 7 starting at 5:00 p.m.

Join in for this fun and beautiful family-friendly event in the towns of Gardnerville and Minden, who have joined Main Street Gardnerville to support this event. The announcing stand and parade judges will be located at the Carson Valley Museum and Cultural Center. The parade runs from Heritage Park in Gardnerville, down Hwy. 395 to Minden Park. This Year’s Theme is: “Favorite Holiday Movie."

Special Douglas County meeting on Master Plan update and Park Ranch

DOUGLAS COUNTY, Nev. - The Douglas County commissioners will be holding a special meeting on a Development Agreement between Park Ranch Holdings LLC and Master Plan amendments on Tuesday, December 3 at 9:00 a.m.

Rain in the Lake Tahoe Basin; Higher elevation snow and avalanche warning

SOUTH LAKE TAHOE, Calif. - A Winter Storm Warning remains in place for the Lake Tahoe Basin until 10:00 a.m. Monday. It is currently raining at lake level and at Echo Summit.

The Sierra Avalanche Center in Truckee has issued a Backcountry Avalanche Warning for the Sierra from Yuba Pass to Ebbetts Pass from Sunday morning until Monday morning at 7:00 a.m.

The latest storm system is still over the Sierra with more on the way. With high of 38 and low of 33, expect rain to continue in South Lake Tahoe.

Road conditions at 11:00 a.m. Sunday:

I80

Big rigs not allowed on I80 or US50; Chain controls in place over Lake Tahoe area roads

SOUTH LAKE TAHOE, Calif. - Heavy traffic over Donner Summit on I-80, an incoming snowstorm and slick conditions have led Caltrans officials to not allow any commercial tractor-semitrailer combinations on the highway from Applegate to the state line. They estimate this will be the case until Monday morning.

Many of those big rigs were coming over US-50 and Echo Summit, but no longer. The commercial semis 65-feet and longer are no longer allowed over the summit. It is unknown at this time when they will be allowed.

I80 closed due to multiple spin outs; Chain controls up on US50

There have been multiple vehicle spinouts on I80, forcing its closure tonight between Colfax and the Nevada state line. Highway 20 also is closed at Nevada City due to the spinouts. Motorists on I-80 should be prepared for long delays, according to Caltrans.

It is not snowing but ice is a concern.

Chain controls as of 8:45 p.m. Friday:

US 50
Chains Required, All Vehicles Except 4-Wheel Drive with Snow Tires - on US-50 from mile post 59.8 in El Dorado County to mile post 70.6 in El Dorado County in California.

I80

US50 reopens after 77 cows wrangled after escape from jackknifed big rig

10:15 p.m. update: US50 is now open in both directions. The last of the cows were wrangled and removed from the roadway.

77 cows were on the cattle truck when it jackknifed.

* * *
9:00 p.m. update: CHP reports US50 is still closed and they estimate it will reopen by 10:00 p.m.

* * *

It isn't the snow over Echo Summit that is hampering the Wednesday night drive on Highway 50 east of Placerville, its the cows and a jackknifed big rig near Apple Cafe and Carson Road.

A foot of snow blankets South Lake Tahoe; Heavenly opens and road controls in place

SOUTH LAKE TAHOE, Calif. - There is one word to describe Wednesday: SNOW! Winter made its appearance in the Lake Tahoe basin Tuesday and will continue this week as one storm exits and another stops by.

Lake Tahoe Community College is closed for the day. The college will reopen at its normal time after the Thanksgiving holiday weekend on Monday, Dec. 2. The City of South Lake Tahoe offices are open.

Chain controls go up as storm hits Lake Tahoe

5:00 p.m. Update: Expect a snowy night and slow-moving over roads in the Sierra. Chains controls on US50 are now up starting in Cedar Grove, west of Pollock Pines, at Pioneer on SR88, and above Gold Run on I80.

At this hour, traffic is at a standstill on I80 after multiple spinouts and crashes all the way to the California-Nevada state line.

CHP is also reporting some issues on US50 west of Echo Summit with two spots were cars are off the roadway, as well as SR88 near Christmas Valley.

NV Energy prepares for storm heading to Lake Tahoe and offers helpful tips

LAKE TAHOE, Nev. - The incoming winter storm will not only bring with it heavy snow but also wind with gusts up to 115 mph over the crest of the Sierra.

"Safety is our top priorty," said NV Energy Director of Delivery Operations, Brian Costello. He said during these storms there is a concern for both public and staff safety with downed power lines.

NV Energy supplied electricity to the Nevada side of the Lake Tahoe Basin and to the Truckee Donner PUD. Their power lines go over the Mt. Rose Highway into Incline Village and over Kingsbury Grade into the South Shore.

El Dorado County Sheriff's Report

SOUTH LAKE TAHOE, Calif. - El Dorado County Sheriff's Office responds to calls throughout the county. The following are calls that only pertain to the South and West Shore, including Meyers, South Lake Tahoe, Meeks Bay, Tahoma, and the Echo Summit area. There may be some missing calls due to sheriff's logs not being completed at the time of the story.

Last Week's Report:

11/13

1:45 a.m. - Bear Report - 7th Ave, Tahoma - BEAR REPORT

Lake Tahoe and Sierra area roadwork 11/25 - 12/1/19

Most traffic-interfering work will be restricted from 6 a.m. Wednesday, November 27 until 10 p.m. Monday, December 2 due to the Thanksgiving holiday weekend.

LONG-TERM PROJECTS

U.S. Highway 50 (El Dorado County): Work continues on a $5.2 million project to upgrade metal beam guardrail and construct concrete barriers at 89 locations from the Red Hawk Undercrossing to 1.9 miles west of the junction with State Route 89 in Meyers. Completion is expected this fall or spring 2020.

No planned weekend traffic relief in Meyers this winter

MEYERS, Calif. - Residents attending the El Dorado County Town Hall meeting in Meyers on Thursday didn't hear what they wanted to about the upcoming winter and any plans that could be put in place to alleviate traffic jams in neighborhoods.

As is the case with all meetings concerning traffic in Meyers, there were several audience members with ideas from instituting maximum vehicles allowed in the Lake Tahoe Basin to turn restrictions and road closures during specific hours.

Holiday Engine schedule from Lake Valley Fire Protection DIstrict

The Lake Valley Fire Protection District has released its much anticipated holiday fire engine schedule. They will be driving through neighborhoods in the county portions of the South Shore.

LVFPD Holiday Engine Schedule

They start about dark (5:00 p.m.) and go to 8:00 p.m.

December 11 – Echo View Estates, Tahoe Mountain Road, Mule Deer Circle
December 12 – Lake Tahoe Blvd from Boulder Mountain Drive to Grizzly Mountain Drive

Douglas County Commissioners to discuss end to monthly meeting in Lake Tahoe

STATELINE, Nev. - Currently, the Douglas County Board of Commissioners meet once a month at Lake Tahoe, but if Commissioner John Engels gets his way, this week's meeting will be their last at the Lake Tahoe Visitor's Authority (LTVA) building.

They have been meeting at the lake on the third Thursday of the month, but Engel's presentation will suggest this meeting take place in Minden just as their other three monthly meetings do.

NWS issues Special Weather Statement for the Sierra

SOUTH LAKE TAHOE, Calif. - A low-pressure system is likely to bring light snowfall to the Sierra as well as far southern Lyon and far western Mineral counties, mainly above 6500 to 7000 feet, Tuesday night through Wednesday evening.

Lake Tahoe, Sierra and El Dorado County roadwork 11/17 - 11/23/19

SOUTH LAKE TAHOE, Calif. - Caltrans will continue roadwork projects in El Dorado County and Lake Tahoe as weather permits. All grading has been completed until Spring 2020.

LONG-TERM PROJECTS

U.S. Highway 50 (El Dorado County): Work continues on a $5.2 million project to upgrade metal beam guardrail and construct concrete barriers at 89 locations from the Red Hawk Undercrossing to 1.9 miles west of the junction with State Route 89 in Meyers. Completion is expected this fall or spring 2020.

Public input sought at next US50 Main Street Management Plan Open House

Event Date: 
November 20, 2019 - 5:30pm

SOUTH LAKE TAHOE, Calif. - The third of four open houses to discuss the Highway 50/Main Street Management Plan for the South Shore will be held on Wednesday, November 20 from 5:30 p.m. to 7:30 p.m. at the Lake Tahoe Resort Hotel in South Lake Tahoe.

After the Tahoe Regional Planning Agency (TRPA) approved the Highway 50 Revitalization Plan last year, focus has been on the Main Street plan (MontBleu/Lake Parkway to Pioneer Trail).

Kentucky man arrested after allegedly stealing EDSO vehicle from South Lake Tahoe parking lot

SOUTH LAKE TAHOE, Calif. - A 30-year-old man from Kentucky is behind bars after allegedly stealing an El Dorado County Sheriff's Office (EDSO) patrol car from South Lake Tahoe.

During shift change on Wednesday morning at their South Lake Tahoe office, a deputy noticed their loaded patrol SUV was missing from the parking lot. EDSO immediately began to track the SUV and found it to be traveling westbound on US50 past Echo Summit so they advised CHP, Placerville Police Department (PPD) and EDSO units on the west slope.

Head-on collision at Lake Tahoe sends both drivers to hospital

LAKE TAHOE, Nev. - Two drivers were transported to area hospitals with substantial injuries after their vehicles collided on US50 north of Skyland late Sunday afternoon.

At this time the Nevada Highway Patrol is not releasing many details due to possible prosecution in the case, according to spokesperson Trooper Hannah DeGoey.

Sunday crash closes all lanes of US50 near Cave Rock at Lake Tahoe

7:00 p.m. update - Nevada Highway Patrol reports that all lanes of US50 have now been reopened. No other details of the crash have been released.

* * *
7:00 pm. update - Some drivers have informed South Tahoe Now that they have been able to start moving, though very slow and with one-way controlled traffic. Officially road is still listed as closed.

* * *
LAKE TAHOE, Nev. - All lanes of US50 at Tall Pines Road in Glenbrook are closed at this hour due to a head-on collision.

Careflight is en route according to the Nevada Highway Patrol.

Mt. Rose lane closures as NDOT works on highway improvements

Single lane closures will take place on a section of the Mt. Rose Highway summit (State Route 431) Nov. 12-15 as part of continuing Nevada Department of Transportation (NDOT) roadway improvements.

Between 7:00 a.m.-5:00 p.m. Nov. 12 through Nov. 15, single lane closures with traffic flaggers alternating directions of travel will be in place on Mt. Rose Highway just below the Mt. Rose ski area. Motorists should anticipate minor travel delays.

Roadway signage is being enhanced to further focus driver attention on navigating the mountainous roadway turns.

Lake Tahoe and Sierra area roadwork 11/10 - 11/16/19

SOUTH LAKE TAHOE, Calif. - As weather allows, Caltrans will continue work as they wrap up their projects. NOTE: Most lane closures are restricted on Monday, November 11 due to the Veterans Day holiday.

LONG-TERM PROJECTS

U.S. Highway 50 (El Dorado County): Work continues on a $5.2 million project to upgrade metal beam guardrail and construct concrete barriers at 89 locations from the Red Hawk Undercrossing to 1.9 miles west of the junction with State Route 89 in Meyers. Completion is expected this fall or spring 2020.

Caltrans and partners officially open first of two roundabouts in Meyers

Caltrans addressed what they reported to be an increase of accidents at the intersection of US50 and SR89 with a $7.3 million roundabout in Meyers, and today there was a ribbon-cutting with local partners to officially open it up.

What used to be a T-intersection with one stop sign is now a three-leg roundabout with a bypass lane. Years of studies, planning, environmental reviews, and engineering led to this past summer's build by Q&D Construction.

US50/SR89 roundabout completion to be marked with public ceremony

MEYERS, Calif. - Caltrans has completed its U.S. Highway 50/Highway 89 Roundabout Project. They will be joined by partner agencies on Thursday, November 7 at 11:00 a.m. to celebrate the $4.1 million project that converted a T-intersection into a three-leg roundabout with a bypass lane.

Caltrans Project Manager Martin Clark, El Dorado County Supervisor Sue Novasel, Tahoe Regional Planning Executive Director Joanne Marchetta, Tahoe Transportation District Board Chairman Steve Teshara, Q&D Construction Vice President Jeff Bean will be on hand.

Lake Tahoe, Sierra and El Dorado County roadwork 11/3 - 11/9

SOUTH LAKE TAHOE, Calif. - As road construction season in the Sierra winds down, Caltrans crews are wrapping up work for 2019 on several major projects.

LONG-TERM PROJECTS

U.S. Highway 50 (El Dorado County): Work continues on a $5.2 million project to upgrade metal beam guardrail and construct concrete barriers at 89 locations from the Red Hawk Undercrossing to 1.9 miles west of the junction with State Route 89 in Meyers. Completion is expected this fall or spring 2020.

New segment of State Route 89 in Tahoe City opens

TAHOE CITY, Calif. - What many have been waiting for is now open to traffic on the North Shore. The long-anticipated new quarter-mile segment of State Route 89 includes a new 153-foot bridge crossing over the Truckee River, a roundabout on the south end next to the Tahoe City Transit Center and another roundabout on the north end near the Caltrans Maintenance Station, allowing a second entry/exit route for Lake Tahoe’s West Shore.

The new Truckee River Bridge and realignment of SR89 are meant to ease congestion in the Tahoe City area.

Single lane closures on Kingsbury Grade Tuesday-Wednesday

The Nevada Department of Transportation (NDOT) will be working on the Lake Tahoe side of Kingsbury Grade on October 29 and 30. Expect single-lane closures as crews fill roadway cracking.

Small sections of Kingsbury Grade will be reduced to one lane from approximately 7:00 a.m.-4:00 p.m. Tuesday and Wednesday from Meadow Drive to Tramway Drive. Motorists are advised to give extra travel time and to anticipate moderate travel delays as traffic flaggers and pilot cars alternate directions of travel. The road work schedule is subject to change.

California Tahoe Conservancy moves forward with Conolley Beach project

SOUTH LAKE TAHOE, Calif. - The California Tahoe Conservancy (CTC) has been working on improving public access at Conolley Beach in South Lake Tahoe for many years, along with other spots along the lake. During their October meeting, the CTC Board voted to spend up to $420,000 on the "Conolley Beach Public Access Project" for the execution of easements and other agreements to build stairs to the beach, construct a trail, add seating areas and stabilize the slope with boulders.

All back open after overturned truck closes parts of road in South Lake Tahoe

4:00 p.m. UPDATE: Most likley it will be the rate of speed a truck driver was traveling at that caused a semi-truck carrying woodchips to overturn in South Lake Tahoe Monday morning.

The 51-year-old woman from Placerville who was at the wheel was traveling from the south on Emerald Bay Road/US50 when she attempted a right-hand turn onto Lake Tahoe Blvd./US50. The truck tipped over and the cab and woodchips slide over into the westbound lanes of Lake Tahoe Blvd.

El Dorado County Sheriff's Report

SOUTH LAKE TAHOE, Calif. - El Dorado County Sheriff's Office responds to calls throughout the county. The following are calls that only pertain to the South and West Shore, including Meyers, South Lake Tahoe, Meeks Bay, Tahoma, and the Echo Summit area. There may be some missing calls due to sheriff's logs not being completed at the time of the story.

Last Week's Report:

10/16

Lake Tahoe and Sierra area roadwork 10/27 - 11/1/19

SOUTH LAKE TAHOE, Calif. - Caltrans is wrapping up their 2019 road projects in the Sierra and on the California side of Lake Tahoe.

LONG-TERM PROJECTS

Date change for Sierra Boulevard Ribbon Cutting in South Lake Tahoe

Event Date: 
October 31, 2019 - 2:00pm

SOUTH LAKE TAHOE, Calif. - The Sierra Boulevard Complete Streets project will wrap up with a ribbon-cutting and celebration next week. The event was scheduled originally for Tuesday, but weather delays have pushed the ribbon-cutting back to Halloween.

The October 31 ceremony will take place at Sierra Boulevard and US50 from 2:00 p.m. to 2:30 p.m.

Five months of work on the .6 mile, $6 million Sierra Boulevard Complete Streets project will wrap up with the ribbon-cutting and celebration.

Opinion: Sierra Boulevard is at an end; Looking forward to the next beginning

It's been one heck of a summer in terms of driving around town. Between Echo Summit and the Meyers roundabout, the horrible accident at Elks Club, US50 through town and then the construction at Stateline that caused delays back to Zephyr Cove in mid-September. Luckily, the Stateline issue was quickly remedied, the highway at Elks Club seems mostly repaired, and the Meyers roundabout turned out great.

Caples Fire is now 73 percent contained; 3,434 acres burned

The Caples Fire has been transferred back to USFS and managed by a smaller Type 4 organization now that it is 73 percent contained. A Burned Area Emergency Response (BAER) Team is assigned to the fire to determine what actions need to be taken to repair damage or prevent further damage from erosion and precipitation.

What started as a USFS prescribed burn on September 30 was reclassified as a wildland fire ten days later, giving crews extra and needed resources from local and state responders when winds fanned flames.

Sierra Boulevard to reopen with ribbon cutting ceremony

Update: The City of South Lake Tahoe has moved the ribbon-cutting ceremony to October 31 from 2:00 p.m. to 2:30 p.m. due to weather delays.

SOUTH LAKE TAHOE, Calif. - Five months of work on the .6 mile, $6 million Sierra Boulevard Complete Streets project will wrap up on Tuesday, October 29, 2019, with a ribbon-cutting and celebration, starting at 11:00 a.m.

El Dorado County Sheriff's Report

SOUTH LAKE TAHOE, Calif. - El Dorado County Sheriff's Office responds to calls throughout the county. The following are calls that only pertain to the South and West Shore, including Meyers, South Lake Tahoe, Meeks Bay, Tahoma, and the Echo Summit area. There may be some missing calls due to sheriff's logs not being completed at the time of the story.

Last Week's Report:

10/11

2:40 p.m. Anonymous Sexual Assault - Tahoe Paradise

Lake Tahoe and Sierra area roadwork October 20 - 26

SOUTH LAKE TAHOE, Calif. - Caltrans is conducting work on Lake Tahoe and Sierra highways. The following are their current projects for the week of October 13-19, 2019.

LONG-TERM PROJECTS

U.S. Highway 50 (El Dorado County): Work continues on a $5.2 million project to upgrade metal beam guardrail and construct concrete barriers at 89 locations from the Red Hawk Undercrossing to 1.9 miles west of the junction with State Route 89 in Meyers. Completion is expected this fall or spring 2020.

Seasonal temperatures with wind and chance of rain in South Lake Tahoe

After pleasant weather conditions today, gusty winds and some fire weather, travel, and recreation concerns return Saturday, according to the National Weather Service in Reno.

Today will be characterized by generally light winds and average temperatures in South Lake Tahoe, with some sun. Expect this to change by Saturday, however, as a wave drops out of the Pacific Northwest bringing gusty winds to the region. So, if you have outdoor fall and Halloween decorations, today will be a good day to check that they are secured.

Finishing touches on Sierra Boulevard include striping and landscaping

SOUTH LAKE TAHOE, Calif. - It's been a long summer of road construction in South Lake Tahoe and it is coming to an end, leaving behind a new Sierra Boulevard and Highway 50 and synchronized lighting on the highway.

Both Caltrans and the City of South Lake Tahoe applied for an extension to the October 15 seasonal grading end and they have through the end of October to finish up their projects.

Paving operations are nearly complete on Sierra Blvd. The contractor, Herback General Engineering, will be performing some corrective paving work through the week.

South Lake Tahoe Highway 50 roadwork update

SOUTH LAKE TAHOE, Calif. - Roadwork on a three-year $57 million project along Highway 50 in South Lake Tahoe is coming to an end. Until November 1, crews will be working on some curb and gutter portions of the road along with some sidewalk repair. They will also be working on electrical components, landscaping, erosion control and painting of lines.

Road Beat: 2020 Hyundai Palisade, The Class Act of the Classes

In an all-new vehicle in what can be considered a new size class for SUVs, Hyundai’s new Palisade has hit a Grand Slam (Salami, if you are Italian or a Yankee Fan), but not an ordinary Grand Slam, but this one landed on River Avenue or Waveland Avenue if you’re a Cubby. It is flat out the best SUV I have ever driven with performance, ride, handling, quiet, comfort and economy levels that put it immediately at the top of its class and almost every other class. Palisade is simply a Class act.

South Lake Tahoe forecast: Mostly sunny with slight chance of rain and snow

SOUTH LAKE TAHOE, Calif. - Haze and smoke from the Caples Fire will continue into
Monday, with a more localized area of smoke for South Lake Tahoe, Markleeville and Minden areas immediately downwind of the fire.

Dry conditions with warmer than average temperatures are expected through midweek according to the National Weather Service in Reno. Light winds Monday and Tuesday will be followed by some increase in winds and a cooling trend from Wednesday into

Smoke from Caples Fire continues to enter Lake Tahoe Basin: 3,042 acres burned, 42% contained

Firefighters working on the Caples Fire made good progress on Sunday. They tied in and secured two indirect containment lines on the south side of the fire with a successful tactical firing operation. The area the fire is burning in is exceptionally steep, rugged, with no road access - conditions not safe for direct line construction. Today’s burning and the fire’s natural progression in the past three days has been a low-intensity underburn, consistent with the objectives of the ecological restoration project. The night shift Sunday will monitor and hold established containment lines.

Sierra and Lake Tahoe area roadwork October 13 - 19

SOUTH LAKE TAHOE, Calif. - Caltrans is conducting work on Lake Tahoe and Sierra highways. The following are their current projects for the week of October 13-19, 2019.

LONG-TERM PROJECTS

U.S. Highway 50 (El Dorado County): Work continues on a $5.2 million project to upgrade metal beam guardrail and construct concrete barriers at 89 locations from the Red Hawk Undercrossing to 1.9 miles west of the junction with State Route 89 in Meyers. Completion is expected this fall or spring 2020.

Volunteer mapping of invasive plants along Upper Truckee River completed

SOUTH LAKE TAHOE, Calif. - A three-year effort to survey the Upper Truckee River for aquatic invasive plants has wrapped up. Community members, supported by staff from the League to Save Lake Tahoe, Tahoe Resource Conservation District, and California State Parks joined together to map the plants in order to prevent their spread during major upcoming restoration projects along the river, Lake Tahoe’s largest tributary.

Syndicate content