Caltrans

Safety along Highway 50 in South Lake Tahoe analyzed

Highway 50 through South Lake Tahoe serves a lot of functions, from a local road for commuters both on bicycles and in cars, to a major highway to transport visitors through the city.

Drivers disobeying "No Parking" and cone zones on Echo Summit

Hundreds of vehicles disobey parking rules along Echo Summit and Highway 50 each winter as they try to find a place to park so people can stop and play in the snow. Their parking on a highway is dangerous, and the California Highway Patrol is trying deter parking to encourage them to park where legal.

Lake Tahoe area roadwork December 17 - 23

The following are the Lake Tahoe and El Dorado County road projects being done in the coming week by the California Department of Transportation (Caltrans).

LONG-TERM PROJECTS

Possible new home for South Lake Tahoe homeless warming room

At the last count there were 82 homeless persons and ten homeless families living in South Lake Tahoe, and to help protect them during the winter, the Lake Tahoe Homeless Coalition has operated a Warm Room in the city.

They too are now homeless and asked the City Council on Tuesday to move into the city-owned building at 1195 Rufus Allen Boulevard, the former home of Unity at the Lake church.

2017 Tahoe in Depth issue covers multiple Lake Tahoe challenges and actions

For five years, the Tahoe Regional Planning Agency (TRPA) has been publishing "Tahoe In Depth," a newspaper highlighting Lake Tahoe and how to protect, enjoy and explore the Lake Tahoe Basin. It also highlights environmental accomplishment and projects around the lake.

'Tahoe In Depth' is mailed to all homeowners in the basin and at distribution points around the lake, and is online at http://www.trpa.org/about-trpa/press-room/tahoe-in-depth/.

Lake Tahoe area roadwork December 10 - 16

As weather permits, the California Department of Transportation (Caltrans) has scheduled projects at Lake Tahoe and in El Dorado County. The following are the projects for the week:

LONG-TERM PROJECTS

Lake Tahoe area roadwork December 3-9, 2017

The following is the California Department of Transportation (Caltrans) roadwork schedule for the Lake Tahoe and El Dorado County area.

LONG-TERM PROJECTS

Road closures on Hwy 50 and I-80 this week for new sign installations

California Department of Transportation (Caltrans) is alerting motorists that lane and highway closures on area freeways will be required to replace three overhead changeable message signs with new “Advanced Variable Message Signs” or AVMS. The new signs will be installed in the following locations:
Interstate 80 westbound – Truckee – Donner Pass Road/Hwy 89
Interstate 80 westbound – Davis – Pole Line Road bridge
U.S. Highway 50 eastbound – El Dorado Hills – Latrobe Road

Lake Tahoe area roadwork for November 26 - December 2

The following are the California Department of Transportation (Caltrans) projects around Lake Tahoe and El Dorado County.

LONG-TERM PROJECTS

Lake Tahoe area roadwork for November 19-25

The following is California Department of Transportation (Caltrans) roadwork projects in the Lake Tahoe Basin and El Dorado County.

Note: Most traffic-interfering work will be limited from 6 a.m. Wednesday, November 22 through Sunday, November 26 because of the Thanksgiving holiday.

LONG-TERM PROJECTS

Caltrans Highway 50 project in South Lake Tahoe done for season

One year down, two to go! Work has concluded for the season on a major Caltrans construction project in South Lake Tahoe from the "Y" to Trout Creek.

Lake Tahoe area roadwork for November 13-18

The following is the scheduled roadwork by the California Department of Transportation (Caltrans) for roads on the California side of Lake Tahoe and in El Dorado County.

LONG-TERM PROJECTS

Caltrans testing cannons near Echo Summit Tuesday

The California Department of Transportation (Caltrans) is testing their avalanche control above Highway 50 and Echo Summit on Tuesday, November 14. Some cannons were tested during the morning and another set will be tested in early afternoon.

Some loud booms will be heard around the South Shore during testing.

New cannons to fight avalanches in South Lake Tahoe

Many people in Meyers and South Lake Tahoe heard "loud booms" early Tuesday afternoon. Those who have lived through winter recognized the sound as avalanche control cannons, but with no snow the reasons weren't clear.

Here is the story:

California Department of Transportation (Caltrans) was installing new cannons to replace the 25-year-old equipment on Flagpole Mountain, home to the Echo Summit avalanche control operations.

Lake Tahoe area roadwork for November 5-11

Here is the Lake Tahoe Basin and El Dorado County roadwork schedule from the California Department of Transportation (Caltrans) for Sunday, November 5 through Saturday, November 11, 2017.

LONG-TERM PROJECTS

Sierra Boulevard Complete Streets project closer to summer 2018 construction

The updated Sierra Boulevard Complete Streets Project was presented to the community Thursday night, with changes incorporated after input from the public at their first meeting August 17, 2017.

Funded by grants, the .6 mile stretch of Sierra Boulevard starting at Highway 50 will have Class 1 and Class 2 bike lanes, parallel parking spots, reduced lane size, lighted sidewalks, underground utilities, landscaping, crosswalks and water quality improvements.

Highway 50 roadwork in South Lake Tahoe extended through November

Construction on U.S. Highway 50 in South Lake Tahoe will be extended through the end of November, weather permitting. The work remaining includes the installation of new traffic signals at Tahoe Keys Boulevard and 3rd Street.

Expect lane closures and extra traffic on U.S. Highway 50 in South Lake Tahoe from the "Y" to Winnemucca Avenue during these final stages.

The project is a three-year one and includes water quality improvements, a new stop light at Lodi, timed traffic lights from the Y to Trout creek, bike lanes, bus pull outs, sidewalks and retaining walls.

New gas tax starts November 1 in California; Prices up 12 cents/gallon

Higher fuel taxes are set to start November 1, 2017, raising the base gasoline excise tax from 18 cents to 30 cents per gallon. Senate Bill 1 was signed into law by California Jerry Brown and contains other increases that will cover the state's transportation needs for the next ten years with an extra $52 billion in revenue.

Other funds are coming from a new transportation improvement fee based on vehicle value, and paying off past transportation loans, Caltrans savings, and new charges on diesel fuel and zero-emission vehicles.

Lake Tahoe area roadwork for October 29 - November 3

As the road construction season winds down, the California Department of Transportation (Caltrans) has announced the following work schedules on roads in the Lake Tahoe Basin and El Dorado County:

LONG-TERM PROJECTS

Upcoming North Lake Tahoe grinding and paving projects

Several sections of North Lake Tahoe highways are scheduled to be worked on over the next nine days, beginning Thursday in Tahoe City.

Grinding and paving work on Highway 28 at the Tahoe City “Wye” is scheduled for Thursday and Friday, requiring reversing one-way traffic control on both Highways 28 and 89 from 7 a.m. to 7 p.m.

On Saturday, the contractor, Martin Brothers, will be working on Highway 267 in Kings Beach. There will be one-way traffic control there as well from 7 a.m. to 7 p.m., with up to 20-minute delays.

Lake Tahoe area roadwork for October 23-28

California Department of Transportation (Caltrans) has ongoing projects in El Dorado County and the Lake Tahoe Basin. Here is what they are working on this week:

LONG-TERM PROJECTS

Column: Tahoe taking action on forest health

The heartbreaking fires in Northern California’s wine country this month have upended hundreds of thousands of people’s lives. In just over one week, the fires across Northern California burned more than 220,000 acres, destroyed 6,000 buildings, and killed more than 40 people. Our hearts go out to our neighbors in Napa, Sonoma, and Mendocino counties.

Stretch of highway renamed for fallen South Lake Tahoe firefighter

The Michael “Mikey” Hallenbeck Memorial Highway was dedicated Saturday during a ceremony on Echo Summit near South Lake Tahoe.

Hallenbeck was a 21-year-old firefighter when he died on August 8, 2015 after a tree fell on him as he was fighting the Sierra Fire.

The stretch of Highway 50 from Mt. Ralston Road to Echo Summit now has signage at each end commemorating the fallen fire fighter who worked winters at Sierra-at-Tahoe.

Lake Tahoe area roadwork for October 15-21

The following is a list of Caltrans projects for the following week in Lake Tahoe.

SPECIAL EVENT

State Route 89 (El Dorado County) will be closed to vehicle traffic in each direction around Emerald Bay from approximately 7 a.m. to 11 a.m. on Sunday, October 15 during the Lake Tahoe Marathon. Motorists should be aware of runners along the highway from Homewood to South Lake Tahoe. For more information on all the events from October 13-15, visit www.laketahoemarathon.com/

EMERGENCY PROJECTS

Highway 50 construction in South Lake Tahoe extended

Construction on U.S. Highway 50 in South Lake Tahoe has been extended through the end of October, weather permitting.

Expect lane closures near the "Y" to Winnemucca Avenue. No detours will be in place so expect heavy traffic and delays.

Caltrans announced Tuesday they are working hard to finish this stretch of the new storm drain system project, suggesting drivers to plan ahead and #BeWorkZoneAlert.

"Thanks for your patience as we work to help protect Lake Tahoe's water and keep it clean for generations to come," said Caltrans.

Kings Beach Revitalization Project comes to a close, more projects planned for area

With the clearing out of the construction staging area at the corner of Fox Street and Highway 28 in Kings Beach, the end of an era for the revitalization of Kings Beach comes to a close.

Officials at Placer County today thanks everyone who shared their input and helped make this project a big success, and for patience with the inconveniences that road construction projects bring.

Items completed this season include:

Lake Tahoe area roadwork for October 8-14

The following report is from Caltrans on projects and activities on their roads in Lake Tahoe.

SPECIAL EVENT

U.S. Highway 50 (El Dorado County) from 5 Mile Road to Carson Road in Camino: Eastbound motorists can expect the left turn lanes to be closed at 5 Mile Road, lower Carson Road and upper Carson Road from 10 a.m. to 3 p.m. Sunday, October 8 and Saturday October 14 for Apple Hill Season. Motorists will be directed to Exit 54/Cedar Grove to access Carson Road.

EMERGENCY PROJECTS

Lake Tahoe area roadwork for October 1-7

Caltrans will be working on Lake Tahoe area roads as long as weather allows. Here is their schedule for the week of October 1-7, 2017.

EMERGENCY PROJECTS

U.S. Highway 50 (El Dorado County) from Forest Road to the PG&E canal in Fresh Pond: The highway is reduced to one lane in each direction at Bridal Veil Falls roadway repair work. Completion is expected in late fall.

U.S. Highway 50 (El Dorado County): The highway is reduced to one lane in each direction at Bridal Veil Falls roadway repair work. Completion is expected in late fall.

TRPA announces top 15 Best in the Basin awards

he Tahoe Regional Planning Agency (TRPA) on Wednesday recognized 15 exceptional projects completed in 2016 with Best in Basin awards.

Now in its 27th year, TRPA’s Best in Basin awards program each year showcases projects around the lake that demonstrate exceptional planning, implementation, and compatibility with Tahoe’s natural environment and communities.

I-80 ramp closures in Truckee this week

Caltrans is alerting motorists traveling on westbound Interstate 80 of the planned closure of Exit 184 from westbound I-80 to Donner Pass Road from 7:00 a.m. to 5:00 p.m. Tuesday and Wednesday, September 26 – 27 for emergency pavement repairs. The on-ramp to westbound I-80 from Donner Pass Road will remain open. Motorists can continue on westbound I-80 to the next exit at Donner Lake Road to reverse direction and access Donner Pass Road from eastbound Interstate 80.

Lake Tahoe area roadwork for September 24-30

The following is the roadwork schedule from Caltrans on Lake Tahoe area roads.

SPECIAL EVENT
State Routes 28 and 267 (Placer County): Motorists should be alert for increased road cyclists on sections of State Routes 28 and 267 from 8 a.m. to 4 p.m. Sunday during the “Stetina’s Sierra Prospect” cycling event. Remember to share the road and allow at least three feet of space. For race information, visit:https://www.sierraprospect.com/

EMERGENCY PROJECTS

Over $3.3M awarded to Lake Tahoe area projects

SOUTH LAKE TAHOE, Calif. - The California Tahoe Conservancy Board yesterday awarded up to $3,359,081 in Proposition 1 funds for eight projects to improve the Lake Tahoe Basin’s forests, lake clarity, and water quality.

Lane restrictions extended in South Lake Tahoe Friday

SOUTH LAKE TAHOE, Calif. – Caltrans work in South Lake Tahoe is normally suspended at 11:00 a.m. on Fridays due to weekend traffic, but weather this week has caused roadwork to go through the day September 22.

Highway 50 will be reduced to one lane in each direction from Dunlap Drive to Winnemucca Avenue on Friday to allow for paving and striping from about 11:00 a.m. to 5:00 p.m. The work again will be dependent on weather and temperature conditions.

Lake Tahoe area roadwork for September 17-23

The following is the California Department of Transportation (Caltrans) roadwork schedule for the Lake Tahoe area.

EMERGENCY PROJECTS

U.S. Highway 50 (El Dorado County) from Forest Road to the El Dorado Ditch in Fresh Pond: Westbound motorists can expect #2 lane closed for pavement repair. Completion is expected by the end of October.

U.S. Highway 50 (El Dorado County): The highway is reduced to one lane in each direction at Bridal Veil Falls for slope and roadway repair work. Completion is expected by the end of this year.

LONG-TERM PROJECTS

Motorists reminded of lane changes in Caltrans work in Lake Tahoe

Motorists can expect longer delays on the Highway 50 project in South Lake Tahoe starting at midnight tonight as increased lane restrictions go into place for the rest of the construction season.

Beginning at 12:01 a.m. Monday, and around the clock until 11:00 a.m. Friday each week, Highway 50 (Lake Tahoe Boulevard) will be reduced to one lane in each direction from Dunlap Drive to Winnemucca Avenue to accommodate grinding and paving operations. Motorists can expect delays of up to 30 minutes.

Expect these lane restrictions to be in place until Friday, October 13.

Expect delays with start of new road project at Emerald Bay

Work has begun on a stretch of State Highway 89 near Emerald Bay to replace a retaining wall and the extend an existing barrier slab and rail.

The contractor, Stewart Engineering, Inc. has established a staging area at the Eagle Falls parking area on the southbound side of the road. Visitors to the area should note that most, if not all, of the parking spots will be blocked by equipment.

Caltrans said work will take place Monday through Friday from 6:00 a.m. to 6:00 p.m. There will be reversing one-way traffic control so motorists should expect delays of up to 20 minutes.

Lake Tahoe area roadwork for September 3-9

The following is the California Department of Transportation (Caltrans) roadwork schedule for the Lake Tahoe area.

NOTE: Most traffic-interfering work will be limited through midnight Monday, September 4 due to the Labor Day holiday.

EMERGENCY PROJECT

U.S. Highway 50 (El Dorado County): The highway is reduced to one lane in each direction at Bridal Veil Falls for slope and roadway repair work. Completion is expected by the end of the year.

LONG-TERM PROJECTS

Woman injured after crashing into traffic signal

SOUTH LAKE TAHOE - A local woman was injured Saturday afternoon and she crashed her van into the light signal at the corner of Lake Tahoe Boulevard and Takela Drive.

The unidentified woman was transported to Barton Hospital with serious injuries.

A traffic signal was knocked off the pole, leaving it dangling over Lake Tahoe Blvd. Caltrans is on their way to South Lake Tahoe from Sacramento to fix the light.

Beacon light at Camp Richardson here to stay, for now

The pedestrian hybrid beacon installed at the Camp Richardson crosswalk will remain active this weekend and until further notice.

Lane restrictions and work hours to increase on Hwy 50 in South Lake Tahoe

Work on the $56 million Highway 50 project in South Lake Tahoe is suspended for the Labor Day weekend, but once the holiday traffic leaves drivers can expect longer delays when lane restrictions are increased.

Starting Tuesday, Sept. 5 at 12:01 a.m., contractor Security Paving Inc. may reduce the highway to one open lane iSn each direction around the clock until 11 a.m. on Fridays.

Beginning Sept. 10, work will be around the clock from midnight Sunday to 11 a.m. Friday each week, with weekends free of construction. Motorists can expect delays of up to 30 minutes.

Choices limited on what to do with California's 102M dead trees

There are now an estimated 102 million dead trees in California, creating unhealthy forests that are prone to major and catastrophic wildfires. Even though funds are being allocated to remove many of them, where will that timber go?
For now, there aren’t many options because of what has transpired from the government since 1968.

In that year the Secretaries of Agriculture and Interior issued orders restricting the volume of timber that could be harvested from Federal lands in the West. It was updated in 1969 to limit the total harvested to 350-million-board-feet.

Lake Tahoe area roadwork for August 27-Sept 2

The following is a list of the Caltrans projects in the Lake Tahoe Basin for the week.

EMERGENCY PROJECT

U.S. Highway 50 (El Dorado County): The highway is reduced to one lane in each direction at Bridal Veil Falls for slope and roadway repair work. Completion is expected by the end of the year.

LONG-TERM PROJECTS

Approval granted for removal of dead and dying trees in Lake Tahoe

The Tahoe Regional Planning Agency (TRPA) Governing Board on Wednesday approved an emergency permit for Caltrans to remove hazardous dying trees along its highways and rights of way in the Tahoe Basin.

California Gov. Jerry Brown declared a tree mortality emergency in October 2015 because of widespread tree die-offs after several years of severe drought. There are now an estimated 102 million dead trees in California, with the greatest tree mortality in the Southern Sierra Nevada.

Lake Tahoe area roadwork for August 20 - 26

The following is the California Department of Transportation (Caltrans) roadwork schedule for the Lake Tahoe area.

EMERGENCY PROJECT

U.S. Highway 50 (El Dorado County): The highway is reduced to one lane in each direction at Bridal Veil Falls for slope repair work.

SPECIAL EVENT

State Route 89 (El Dorado County) at the Sugar Pine State Park entrance: Motorists can expect intermittent traffic control Saturday during the Lake Tahoe Triathlon.

LONG-TERM PROJECTS

Caltrans finishes $62M Lake Tahoe West Shore project on Hwy 89

Work to rebuild State Highway 89 along the West Shore of Lake Tahoe from Tahoma just north of Granlibakken Road in Tahoe City is now complete, Caltrans announced today. It also came in $8,000,000 under budget.

Construction on the project started in 2012 when a contractor for Southwest Gas began relocating gas lines that were in conflict with the new drainage systems to be built. That work was completed in 2014. Caltrans’ contractor, Road and Highway Builders, began drainage work in 2013 and started roadwork in 2014.

Caltrans to close freeway ramps in Truckee for maintenance work

Caltrans is alerting motorists traveling through the Truckee area that the on ramp from southbound Highway 89 to eastbound Interstate 80, as well as the off ramp from Interstate 80 to Central Truckee, will be closed from 7:00 a.m. to 5:00 p.m. Tuesday, August 15 and Wednesday, August 16 for maintenance work.

The ramps sustained damage during the past winter’s storms. Preventing further erosion of the ramp’s pavement and shoulders will help mitigate damage anticipated from future winter storms.

Lake Tahoe area roadwork for August 13-19

The following is the California Department of Transportation (Caltrans) roadwork schedule for the Lake Tahoe area.

EMERGENCY PROJECT

U.S. Highway 50 (El Dorado County): The highway is reduced to one lane in each direction at Bridal Veil Falls for slope repair work. Completion is expected late this year.

LONG-TERM PROJECTS

Caltrans working on I-80 and Hwy 50 this week

Those traveling to and from Lake Tahoe this week may want to take note of traffic alerts on both Interstate 80 and Highway 50.

The California Department of Transportation (Caltrans) will be doing overnight Work to repair rough spots in the roadway Monday night through Friday morning. They will be doing grinding and paving work on U.S. Highway 50 on the section of the roadway that descends after Echo Summit into the Tahoe Basin.

Lake Tahoe area roadwork for August 6 - 12

The following is the California Department of Transportation (Caltrans) roadwork schedule for the Lake Tahoe area. Please note, due to “Hot August Nights” events in Reno, and the expected extra traffic in Tahoe, most lane closures will be restricted from noon Thursday, August 10 until 8 p.m. Monday, August 14.

EMERGENCY PROJECTS

U.S. Highway 50 (El Dorado County): The highway is reduced to one lane in each direction at Bridal Veil Falls for slope repair work.

Sass Talk: Sierra Boulevard, Roadwork, The Crossing, LimeBike and more

The city received some good news this week. We were successfully awarded $2.9 million in federal funds to complete all of the funding for the Sierra Blvd. Streetscape project-we are now 100% funded through construction. Kudos to Stan Hill with the City for his excellent grant application. Per Jim Marino, Asst.

Syndicate content